- Date: Jan 01, 1970
- Client: SUGAR INDUSTRY
- Category: PIPING FABRICATION AND INSTALLATION
- Address: SOHAR PORT
JINDAL SHADEED
Project Experience & Execution ProfileProject 1: Firefighting Piping System, Equipment Erection & Mechanical WorksEnd User / Client: Jindal Shadeed Iron & Steel / Jindal Pellet PlantPrincipal Contractor / Execution Unit: Balabel Technical Trading / Specialised Mechanical Projects DivisionSubcontractor & Supplier: Ameer Technical Service L.L.C & Man Power Solution (ATS)Scope of Work: 100% Full-Scope Turnkey Project Execution for Mechanical Fabrication, Equipment Erection, Welding Installations, and Certified Manpower SupplyProject Capacity / Volume:90,000 Inch-Diameter of High-Precision Pipe Fabrication200,000 Inch-Meter of Piping System Erection & Site InstallationLocation: Sohar Industrial Port, Sultanate of OmanCore Execution DetailsFull-Scope Turnkey Mechanical Support: Managed and executed the complete fabrication, welding, positioning, and erection of industrial-grade firefighting network lines.Massive Volume Piping Fabrication: Deployed high-output fabrication teams to successfully deliver 90,000 Inch-Diameter of custom pipe cutting, beveling, alignment, and spooling.Heavy Structural Piping Erection: Safely executed the rigging, alignment, and heavy-duty structural erection of 200,000 Inch-Meter of primary firefighting transport lines at high elevations and complex industrial plant layouts.Mechanical Equipment Erection: Managed the foundational layout, structural positioning, and secure bolting/alignment of safety-critical heavy firefighting machinery, pumping stations, and pressure-control manifolds.High-Integrity Fire-System Welding: Implemented flawless multi-pass welding protocols to withstand high working pressures, ensuring zero leakage across the entire plant-wide safety loop.
Project Experience & Execution ProfileProject 1: Firefighting Piping System, Equipment Erection & Mechanical
Project Experience & Execution Profile Project
Project Experience & Execution ProfileProject 1: Firefighting Piping System, Equipment Erection & Mechanical WorksEnd User / Client: Jindal Shadeed Iron & Steel / Jindal Pellet PlantPrincipal Contractor / Execution Unit: Balabel Technical Trading / Specialised Mechanical Projects DivisionSubcontractor & Supplier: Ameer Technical Service L.L.C & Man Power Solution (ATS)Scope of Work: 100% Full-Scope Turnkey Project Execution for Mechanical Fabrication, Equipment Erection, Welding Installations, and Certified Manpower SupplyProject Capacity / Volume:90,000 Inch-Diameter of High-Precision Pipe Fabrication200,000 Inch-Meter of Piping System Erection & Site InstallationLocation: Sohar Industrial Port, Sultanate of OmanCore Execution DetailsFull-Scope Turnkey Mechanical Support: Managed and executed the complete fabrication, welding, positioning, and erection of industrial-grade firefighting network lines.Massive Volume Piping Fabrication: Deployed high-output fabrication teams to successfully deliver 90,000 Inch-Diameter of custom pipe cutting, beveling, alignment, and spooling.Heavy Structural Piping Erection: Safely executed the rigging, alignment, and heavy-duty structural erection of 200,000 Inch-Meter of primary firefighting transport lines at high elevations and complex industrial plant layouts.Mechanical Equipment Erection: Managed the foundational layout, structural positioning, and secure bolting/alignment of safety-critical heavy firefighting machinery, pumping stations, and pressure-control manifolds.High-Integrity Fire-System Welding: Implemented flawless multi-pass welding protocols to withstand high working pressures, ensuring zero leakage across the entire plant-wide safety loop.